,
Less than 1% of Chicago crosswalks have accessible pedestrian signals. A new lawsuit filed against the city claims that’s indicative of a “systemic failure.”
A proposal to add a so-called greenway for cyclists and introduce pedestrian-focused safety measures on a Lincoln Park side street has sparked an outpouring of attention from neighbors.
Mayor Lori Lightfoot said the city plans to act with a sense of urgency on it’s just-announced Vision Zero safety plan, a $6 million effort to eliminate the number of traffic-induced serious injuries and deaths.
A portion of northbound Lake Shore Drive reopened Tuesday after having been shut down for more than 24 hours, raising questions about the condition of Chicago’s other bridges. 
Chicago could see a significant increase in electric cars by the end of the next decade, but drivers will need the city to install thousands of new charging stations to keep those cars on the road.
After heavy storms, the Chicago River’s North Branch floods hundreds of homes on the Northwest Side. The Chicago Department of Transportation is now constructing a permanent flood-fighting weapon. We take a look.
The city’s neighborhood cleaning program kicked off this year with additional graffiti-removal crews and new chemical-blasting trucks.
Chicago is offering grant funding to cover up to 30 percent of equipment and installation costs for new direct current fast-charging stations, which can charge electric vehicles in 20 to 30 minutes. 
The city of Chicago wants your feedback on new streetlights. That and other infrastructure projects with Rebekah Scheinfeld, the head of the city’s transportation department.
The completion of the three-block stretch marks the end of construction on the 1.25-mile promenade, providing pedestrian and bike access along the south bank of the river.
Starting Wednesday, a new section of Elston Avenue will open as work on the Damen, Elston and Fullerton reconstruction project continues. Find out what that means for drivers.

Traffic reduced to one lane on Belmont Avenue

The second phase of the reconstruction project at the intersection of Western, Belmont and Clybourn avenues begins Monday. Find out what that means for drivers.
Thanks to fewer potholes this year, the city is already beginning to resurface 55 miles of roads. See a map of the roads that will be resurfaced.
A half-century old, much traveled viaduct in Chicago is about to be torn down. But will the plan to replace it really improve traffic conditions?

Improvements to Start in February, Wrap Up Summer 2017

After several years of delays, the Chicago Department of Transportation (CDOT) says it will demolish the viaduct at the intersection of Western, Belmont and Clybourn avenues and create a new street-grade roadway. But will the new plan to replace it improve traffic conditions? Eddie Arruza has the story.
One of the most sizable redesigns of the Chicago lakefront is underway at Fullerton Avenue beach, and the change is predicted to be eye-popping. By next summer, everyone passing through the area will have a lot more breathing, sunning, and picnicking room. Chicago Tonight's Eddie Arruza has the story.
 

Sign up for the WTTW News newsletter

Thanks to our sponsors:

View all sponsors

Thanks to our sponsors:

View all sponsors

Thanks to our sponsors:

View all sponsors